Historic river crossings in Red Deer

Red Deer, Alberta, Canada

A researched shortlist for Red Deer, Alberta. Compare addresses, practical details and maps.

Key information

This is a growing shortlist. Each place has its own source and address. Read the article for comparisons and dated community opinions.

The historic CPR pedestrian bridge over the Red Deer River
The CPR pedestrian bridge in the city’s project material. Photograph date not supplied; use the article for the 2026 rehabilitation update. Photo: City of Red Deer.
On this page

Place details and maps

CPR Pedestrian Bridge

Red Deer River crossing, Red Deer, Alberta

Historic former railway crossing restored for pedestrians and cyclists.

The historic CPR pedestrian bridge over the Red Deer River
The CPR pedestrian bridge in the city’s project material. Photograph date not supplied; use the article for the 2026 rehabilitation update. Photo: City of Red Deer.
History
Built for rail in 1908
Project
The city lists a$22.3 million rehabilitation budget
Useful for
A river crossing and local-history walk.
Before visiting
The map names the crossing, not a street parking entrance. Check ongoing minor works and the signed trail approach.

Sources: City CPR rehabilitation project

Map searches identify a place and address. They do not verify entrances or step-free routes.

Plan your visit

Useful questions

When did the CPR pedestrian bridge reopen?

The restored CPR pedestrian bridge reopened on September 28, 2026.

Source: City CPR rehabilitation project

When was the bridge first built?

Canadian Pacific built the bridge in 1908, before its later conversion to pedestrian use.

Source: City CPR rehabilitation project

When did trains stop using it?

Railway use ended in 1990, and the bridge subsequently became a pedestrian crossing.

Source: City CPR rehabilitation project

Is it a protected local historic resource?

Yes. Municipal designation dates to 1991.

Source: City CPR rehabilitation project

What was the published project budget?

The published rehabilitation budget was $22.3 million, covering more than the bridge deck alone.

Source: City CPR rehabilitation project

How much federal grant funding was provided?

The project received $11.1 million through a federal active-transportation grant.

Source: City CPR rehabilitation project

What was the city’s approved share?

The approved city budget supplied $11.2 million of the project’s total funding.

Source: City CPR rehabilitation project

Was demolition a free alternative?

No. The city estimated removal and remediation at $6 million to $8 million.

Source: City CPR rehabilitation project

Are the connecting trails accessible again?

The current project page says all connecting trails are accessible.

Source: City CPR rehabilitation project

What is the new north-bank artwork called?

The north-bank plaza includes an artwork called Luminous Passage.

Source: City CPR rehabilitation project